在Hauhinco传统与创新是互不分离的。Hauhinco是1908年在德国斯普罗克霍威尔,鲁尔矿业的摇篮成立的。至今,Hauhinco仍旧牢记自己的由来。再过去的100余年间,公司经历了很多组织结构和市场环境的变化,并仍旧不断地推陈出新,为市场带来创新性的产品。这些经验使得Hauhinco在市场中独树一帜。
Hauhinco是一家拥有悠久历史的成功的中型公司。如今,Hauhinco是世界领先的水液压应用领域供应商。我们的高压柱塞泵,阀以及系统被广泛地应用于世界各地的井下煤矿以及工业领域。而我们的员工正是我们成功的关键。
The pilot valves (5, 6) and the control pcb (8) form the pilot control group of the 2-way control valve. The valve piston (2) guided within the valve body (1) is pressed into the valve seat (3) by the hydraulic power generated by the control pressure (X) on the closing area (5), provided the opening area (4) is depressurised by the activated pilot valve (5). Thus, the lines (A, B) are separated. Activated by the pilot valve (6), the opening area (4) is pressurised and the valve piston (2) lifts off the valve seat (3). The pilot valves (5, 6) are activated according to the controller specification, thus, the valve piston (2) moves into the requested position. The flow cross-section is set analogue to the valve’s piston position. Both proportional pilot valves are 2-way seat valves NC. As soon as the control is switched off, the 2-way control valve remains in the position reached last. If an S/W pilot valve NO (7) is added to the proportional pilot control group, the 2-way control valve is moved into the safe basic position with the control switched off. Pilot valves (5, 6, 7) are fastened to the valve body (1) via the control pcb (8). The basic valve position can also be monitored by a limit switch (9).